COINDU | Sustainability Report - 2024

SUSTAINABILITY REPORT 2024 After lamination, the individual parts are subject to quality evaluation. Each part is stamped to ensure that it is 100% compliant, and to ensure its trace- ability. 6. CUT PARTS INSPECTION The sewing lines are laid out according to the project and customer and have a maximum of 14 opera- tors. These autonomous, multi-purpose and high performance lines are called GAPs. 8. SEWING The final inspection is included in the GAPs, where the covers are inspected and controlled. Some ad- ditional sewing operations can be performed in the inspection area. 9. FINAL INSPECTION All materials required for a seat cover are transported to the sewing area, already prepared in accordance with the production order (OF). In the preparation area, the operators have all the necessary materials (synthetics and leather) needed for sewing a seat cover. 7. PREPARATION OF COMPONENTS 27